JIUNGE NASI WHATSAPP TU FOLLOW. BONYEZA HAPA64 Job Opportunities at Julius Nyerere Hydropower Project JVACEE May 2022
64 Job Opportunities at Julius Nyerere Hydropower Project JVACEE May 2022 JVACEE is a joint venture company of Arab contractor and El-sewedy Electric, dealing with the scope of Engineering, Procurement and Construction of Julius Nyerere Hydropower Project in Stigler’s Gorge in Tanzania. It is expected to produce 2,115 MW of installed Capacity. On the waters of the Rufiji river, in joint venture with The Arab Contractors of Egypt (Osman A. Osman & Co.), ELSEWEDY ELECTRIC is entrusted by the people and government of Tanzania to execute, The Julius Nyerere Hydropower Project.
RECOMMENDED Darasa la Cake By Nory Cakes-Tunafundisha Kupika na Kuremba Keki za Shughuli Mbalimbali Kwa Gharama Nafuu
J–V–A–C–E–E, Julius Nyerere Hydro Power Project (JNHPP) is Urgently Looking for the Following Candidates to fill the available below Positions :–
1) Motor Grader Operator —– 22 positions
2) Excavator Operator ——– 26 Positions
3) Soil Compactor Operator — 10 Positions
4) Soil Reclaimer Operator —– 06 Positions
Qualifications:
Apply Also
Insurance Job | Ajira za Insurance Tanzania
procurements and supply Jobs in Tanzania
Records management jobs Tanzania
Human Resource Job in Tanzania
Nafasi za Kazi Business Administration|Business Administration jobs in Tanzania
Banking and Finance jobs in Tanzania
The Ideal candidate should posses a working experience of not less than 3 Years.
MODE OF APPLICATION
Interested candidates should send their up to date CV’s and ID (National, Voter’s ID or Driving License) to [email protected] and Visit our nearest representative offices of Kisaki Morogoro, or Mloka Rufiji, Pwani.
Deadline is 20th May 2022.
Interviews and work station will be at Julius Nyerere Hydropower Project (JNHPP)
These positions are open for Tanzanian Locals only
Be the first to comment